Subsidy & Govt Schemes

NBPDCL & SBPDCL Solar Net Metering Guide: Rules, Feasibility & Steps

Compliance & Grid Integration, Shree Laxmi TradersJuly 14, 20266 min read
NBPDCL & SBPDCL Solar Net Metering Guide: Rules, Feasibility & Steps

NBPDCL vs SBPDCL: District Coverage

Bihar's electricity distribution is divided into two state DISCOMs:

  • NBPDCL (North Bihar): Serves 21 northern districts including Bhagalpur, Muzaffarpur, Darbhanga, Purnia, Begusarai, Katihar, Saharsa, and Champaran.
  • SBPDCL (South Bihar): Serves 17 southern districts including Patna, Gaya, Nalanda, Bhojpur, Rohtas, Aurangabad, and Munger.

Transformer Feasibility Limit

Under BERC (Bihar Electricity Regulatory Commission) guidelines, cumulative rooftop solar capacity connected to a local distribution transformer must not exceed the allowed threshold (typically 80% of transformer rating). Applying early secures your transformer feeder capacity.

Matching Sanctioned Load with Solar Capacity

Your installed solar capacity generally cannot exceed your connected/sanctioned load. If your current sanctioned load is 2 kW and you wish to install a 3 kW or 5 kW solar system, you must apply for a simple load enhancement through the Suvidha App or National Portal.

Bi-Directional Meter Testing & Sealing

The DISCOM testing lab verifies the accuracy of the bi-directional meter before field installation and applies tamper-evident security seals.

Want a Personalised Solar Calculation?

Calculate your exact monthly bill savings and claim up to ₹78,000 in PM Surya Ghar central subsidy.